Iron Bridge Restoration Project Drawings |
These drawings depict the modern intervention required on the Iron Bridge. There are three key elements; to brace and strengthen the central arched rib, which is the calculated point of weakness that caused it to be condemned in 1990; to allow the 8" gas main currently running across the centre of the bridge to be diverted to one side; and to enable modern parapets to supplement the existing ones because they are not high enough or strong enough to satisfy modern safety standards. These last two requirements have been accommodated by the inclusion of a steel hollow box section (SHS) at each side that will house the gas main and other smaller services and support the new parapets.
We would have preferred not to include as much modern intervention as we are doing, however, this has been agreed over an extended period of development during the project planning phase with input from all stakeholders, including English Heritage. The scheme has received Listed Building Consent and we believe it is the best compromise possible to ensure the bridge is retained for the enjoyment of future generations.
Key requirements for the Conservation Officer and ourselves have been to avoid cutting and retain as much of the original fabric of the bridge as possible and to keep the modern handrails as low as possible in relation to the stone domes at each corner of the bridge. These drivers have contributed to the length of time it has taken to find solutions but have been successfully achieved. This means that in the future, perhaps with technological improvement or an enlightened approach to safety standards, or a combination of both, the modern intervention could all be removed and the old bridge will be revealed intact underneath.
The following images are captured from the drawings. If you click on titles or the pdf icons linking to the drawings themselves you will need Adobe Acrobat Reader to view them. If you don't have this free software package already visit www.adobe.com
General
Arrangement 1 of 2 ![]()
This drawing shows the replacement
horizontal and new diagonal bracing that will strengthen the central arched rib.
The new bracing will be installed at the same locations as the existing tie
rods, which have corroded beyond repair. It also shows the SHS housing the gas
main on one side and smaller services on the other and supporting the new
parapets.

General
Arrangement 2 of 2 ![]()
This drawing includes an external
elevation on the bridge, showing the original parapets with the new parapets
behind. The new parapets will mimic the spacing of the originals and follow the
same profile to ensure they remain as unobtrusive as possible, especially when
viewed from the river bank.

It also includes a cross section (seen from on the bridge) that shows the modern parapets with the old ones behind, and several other details of the SHS where it passes over the abutments.

New
Steel Deck ![]()
This drawing shows the details of the
new steel deck and the SHS (steel hollow box section) that will rest on the
original cast iron beams and on the abutments. A steel deck has been chosen in
order to minimise the deck thickness and keep the new parapets as low as
possible in relation to the stone domes. The gas main will be diverted though
one of the SHS's, which also enables to deck thickness to be kept to a minimum.

If you have any queries on the drawings we will be happy to try and answer them.